ASIA unversity:Item 310904400/9956
English  |  正體中文  |  简体中文  |  Items with full text/Total items : 94286/110023 (86%)
Visitors : 21660176      Online Users : 437
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://asiair.asia.edu.tw/ir/handle/310904400/9956


    Title: Two Heuristics for Scheduling Multiple Projects with Resource Constraints
    Authors: Tsai, D. M.;H. N. Chiu
    Contributors: 亞洲大學經營管理學系
    Keywords: Multiproject Scheduling;Heuristic Rules;Delay;Scheduling;Resource Allocation
    Date: 1996
    Issue Date: 2010-06-10 03:51:49 (UTC+0)
    Publisher: Asia University
    Abstract: The purpose of this paper is to develop two efficient heuristic priority rules for the resource-constrained multiproject scheduling problem. The aptness of the two heuristic rules is analysed in terms of several dynamic characteristics of the scheduling problem. Fifteen heuristic rules presented in previous studies are used for comparison with the two heuristic rules on 4941 test problems which were generated by combining two, three or four projects from seven typical networks. The results indicate that the two proposed heuristics are superior to the other scheduling rules under the performance criteria of the minimum total project delay and the maximum number of times that a scheduling rule can obtain the best solution. Encouragingly, the two heuristic rules are proven to be adaptive and stable enough for scheduling under different problem sizes, network structures and degrees of resource tightness. As a result, the two proposed rules are the best representatives of the single priority rule method and the weighted combination search method, respectively. This study also includes a categorization process on which a project summary measure is based and then provides project schedulers with a convenient scheme to adopt appropriate scheduling rules.
    Relation: Construction Management and Economics, E. & F. N. Spon 14(4) : 325-340
    Appears in Collections:[Department of Business Administration] Journal Article

    Files in This Item:

    File Description SizeFormat
    0KbUnknown351View/Open
    310904400-9956.doc36KbMicrosoft Word146View/Open


    All items in ASIAIR are protected by copyright, with all rights reserved.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback