English  |  正體中文  |  简体中文  |  Items with full text/Total items : 94286/110023 (86%)
Visitors : 21652068      Online Users : 672
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    ASIA unversity > 管理學院 > 經營管理學系  > 期刊論文 >  Item 310904400/18307


    Please use this identifier to cite or link to this item: http://asiair.asia.edu.tw/ir/handle/310904400/18307


    Title: A Fuzzy Multi-Criteria Decision Making Approach for Solving a Bi-Objective Personnel Assignment Problem
    Authors: 黃燈奎;Huang, Deng-Kui;邱煥能;Chiu, Huan-Neng;葉瑞徽;Yeh, Ruey-Huei;張仁輝;Chang, Jen-Huei
    Contributors: 經營管理學系
    Keywords: Personnel assignment;Multi-criteria decision making;Interdependence positions;Fuzzy goal programming
    Date: 2009-02
    Issue Date: 2012-11-26 04:46:59 (UTC+0)
    Abstract: Effective personnel assignment is one of the most crucial tasks performed by the decision makers of a company. This paper proposes a systematic approach with a feedback mechanism in which the interdependences among positions and the differences among the selected employees are considered simultaneously. Unfortunately, the two combined considerations have rarely been discussed in the literature. The purpose of this approach is to obtain the best matching of candidates and positions in order to organize a collaboratively cross-functional team. In a fuzzy environment and, then, in the proposed approach, a bi-objective binary integer programming (BOBIP) model is formulated. Based on the weighted composite scores determined in the third step of the proposed procedure, the BOBIP model is transformed into a fuzzy bi-objective goal programming (FBOGP) model. An elaborately designed heuristic algorithm is developed to determine the appropriate values of several important parameters in the FBOGP model, which is solved using LINDO 8.0. An application example is illustrated, and two additional examples are tested. The results indicate that the proposed approach achieves the acceptable satisfaction level and requires less computation time than the brute force enumerative method.
    Relation: COMPUTERS & INDUSTRIAL ENGINEERING,56(1),1–10.
    Appears in Collections:[經營管理學系 ] 期刊論文

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML449View/Open


    All items in ASIAIR are protected by copyright, with all rights reserved.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback