English  |  正體中文  |  简体中文  |  Items with full text/Total items : 94286/110023 (86%)
Visitors : 21710102      Online Users : 498
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version


    Please use this identifier to cite or link to this item: http://asiair.asia.edu.tw/ir/handle/310904400/1815


    Title: 應用同步工程於CMMI之整合的專案管理流程領域
    Applying Concurrent Engineering to Integrated Project Management Process Area of CMMI
    Authors: 姚奮宏
    Contributors: 資訊多媒體應用學系碩士班
    Date: 2005
    Issue Date: 2009-10-12 11:55:25 (UTC+0)
    Publisher: 亞洲大學
    Abstract: 為了提昇軟體產業的競爭力,必須有效地縮短開發週期及整合流程,以降低生產成本。同步工程是一應用系統化的方法,可以有效地整合產品設計以及縮短產品開發週期。美國卡內基美隆大學(Carnegie-Mellon University)軟體工程學院(Software Engineering Institute, SEI)為了提昇軟體品質,提出能力成熟度整合模式(Capability Maturity Model Integration, CMMI)。

    由於CMMI並未對如何達到目標具體方法做一詳述,只有列舉應達到之目標基準。因此,本研究應用同步工程(Concurrent Engineering)於CMMI連續式表述中的整合的專案管理流程領域為改善的目標,主要目的是進行CMMI導入時,引用同步工程之概念,使得各特定目標與特定執行方法間,所需之資訊可以共享,並且各指標可同步建構與修正。透過此同步性的作法,一方面可以降低軟體開發時間,以及減少成本與資源的浪費,同時能夠提供正確且彈性的規劃,達到CMMI要求之指標。
    Appears in Collections:[行動商務與多媒體應用學系] 博碩士論文

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML533View/Open


    All items in ASIAIR are protected by copyright, with all rights reserved.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback