English  |  正體中文  |  简体中文  |  Items with full text/Total items : 94286/110023 (86%)
Visitors : 21716636      Online Users : 421
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    ASIA unversity > 資訊學院 > 資訊工程學系 > 博碩士論文 >  Item 310904400/12748


    Please use this identifier to cite or link to this item: http://asiair.asia.edu.tw/ir/handle/310904400/12748


    Title: Using PMBOK Techniques with Dynamic Forms to Create Online Project Management Plans
    Authors: Hsu, Chih-Hsueh
    Contributors: Department of Computer Science and Information Engineering
    Keh-Ming Lu;Hsing-Chung Chen
    Keywords: Dynamic Forms;Step-by-step Project Management;Project Management Knowledge Areas;Project Management Body of Knowledge Guide(PMBOK);Project Management;Work Breakdown Structure(WBS)
    Date: 2012
    Issue Date: 2012-11-18 09:00:58 (UTC+0)
    Publisher: Asia University
    Abstract: Project management not only is an integral part of information technology, but also can be widely applied in any sizes of projects. Therefore, the study is to integrate project management with information technology, and to create a project plan development system that can be used by all different types of projects. Appling the developed system, project sponsor can control all basic information in the initial phase; project manager can update project information and manage the progress of the project anytime during the project life cycle; project sponsor and/or project manager may obtain a project summary report in the project closing phase. During the progress of the project, project manager and authorized team members may need many forms. The study is to use the 15 common tools and forms of Project Management Body of Knowledge, PMBOK. The researcher convert them into the forms of database, and then by using a mechanism of dynamic forms to determine the next forms by the information that provided by authorized project team members of via Web Pages of Internet. Employing the model of on-line filling forms, project manager can show the progress of project in any phases and produce a complete project plan report in the project closing. Through simulating different types of projects, researcher validated the developed system and showed the integrity and completeness of the project information. The study of development system follows five process groups in PMBOK accordingly and develops the project plan system systematically. In addition to a complete structure, it not only enforces the completeness of project plan but also effectively monitors and controls the progresses and quality of project during the project life cycles.
    Appears in Collections:[資訊工程學系] 博碩士論文

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML335View/Open


    All items in ASIAIR are protected by copyright, with all rights reserved.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback