ASIA unversity:Item 310904400/113026
English  |  正體中文  |  简体中文  |  全文笔数/总笔数 : 94286/110023 (86%)
造访人次 : 21668128      在线人数 : 1037
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
搜寻范围 查询小技巧:
  • 您可在西文检索词汇前后加上"双引号",以获取较精准的检索结果
  • 若欲以作者姓名搜寻,建议至进阶搜寻限定作者字段,可获得较完整数据
  • 进阶搜寻
    ASIA unversity > 管理學院 > 經營管理學系  > 期刊論文 >  Item 310904400/113026


    jsp.display-item.identifier=請使用永久網址來引用或連結此文件: http://asiair.asia.edu.tw/ir/handle/310904400/113026


    题名: Optimum Replacement Policy for Cumulative Damage Models Based on Multi-Attributes
    作者: 徐世輝
    SHEU, SHEY-HUEI
    Liu, Tzu-Hsin
    Liu, Tzu-Hsin
    Zhe-George, Zhe-George Z
    Zhang, Zhe-George
    Tsa, Hsin-Nan
    Tsai, Hsin-Nan
    贡献者: 經營管理學系
    日期: 2020-01-20
    上传时间: 2020-10-14 05:26:15 (UTC+0)
    出版者: 亞洲大學
    摘要: In the present paper, we investigate a preventive replacement policy based on multiple attributes. A system is subject to two types of shocks which arrive according to a non-homogeneous Poisson process. Type 1 shocks are minor and cause a random amount of damage to the system. We use a minimal repair to fix type 1 shock. Type 2 shocks are catastrophic and the system is correctively replaced at its occurrence. The probabilities of type 1 shock and type 2 shock are assumed to depend on age. A system fails (in a catastrophic failure type) once the cumulative damage reaches a failure level K or a type 2 shock happens. In addition, the system with cumulative damage of level z may fail (in a minor failure type) with probability at each type 1 shock occurrence and be rectified by a minimal repair. A replacement policy based on nature of failure, cumulative damage, system age and number of type 1 shocks is formulated. Under this policy, preventive replacement is made before catastrophic failure when the age of the system reaches T or the number of occurrences of type 1 shock achieves N or the accumulative damage exceeds a level Z but less than K, whichever occurs first, and corrective replacement is immediately carried out whenever the catastrophic failure of the system happens. We determine the optimum preventive replacement schedule such that the expected cost per unit time is minimized. The proposed model extends many existing models since the framework and analysis are general. Finally, the numerical example is provided.
    關聯: COMPUTERS & INDUSTRIAL ENGINEERING
    显示于类别:[經營管理學系 ] 期刊論文

    文件中的档案:

    档案 描述 大小格式浏览次数
    index.html0KbHTML274检视/开启


    在ASIAIR中所有的数据项都受到原著作权保护.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - 回馈