English  |  正體中文  |  简体中文  |  Items with full text/Total items : 94286/110023 (86%)
Visitors : 21665660      Online Users : 612
RC Version 6.0 © Powered By DSPACE, MIT. Enhanced by NTU Library IR team.
Scope Tips:
  • please add "double quotation mark" for query phrases to get precise results
  • please goto advance search for comprehansive author search
  • Adv. Search
    HomeLoginUploadHelpAboutAdminister Goto mobile version
    ASIA unversity > 管理學院 > 經營管理學系  > 期刊論文 >  Item 310904400/112754


    Please use this identifier to cite or link to this item: http://asiair.asia.edu.tw/ir/handle/310904400/112754


    Title: Optimization issues in k-out-of-n systems
    Authors: 徐世輝;SHEU, SHEY-HUEI;Liu, Tzu-Hsin;Liu, Tzu-Hsin;Tsa, Hsin-Nan;Tsai, Hsin-Nan;Zhe-George, Zhe-George Z;Zhang, Zhe-George
    Contributors: 經營管理學系
    Keywords: ReplacementExcess costShortage costRandom working timeOptimization
    Date: 2019-09
    Issue Date: 2020-08-27 07:31:06 (UTC+0)
    Publisher: 亞洲大學
    Abstract: The k-out-of-n system is a system consisting of n independent components such that the system works if and only if at least k of these n components are successfully running. Each component of the system is subject to shocks which arrive according to a nonhomogeneous Poisson process. When a shock takes place, the component is either minimally repaired (type 1 failure) or lying idle (type 2 failure). Assume that the probability of type 1 failure or type 2 failure depends on age. First, we investigate a general age replacement policy for a k-out-of-n system that incorporates minimal repair, shortage and excess costs. Under such a policy, the system is replaced at age T or at the occurrence of the (n-k + 1)th idle component, whichever occurs first. Moreover, we consider another model; we assume that the system operates some successive projects without interruptions. The replacement could not be performed at age T. In this case, the system is replaced at the completion of the Nth project or at the occurrence of the (n-k + 1)th idle component, whichever occurs first. For each model, we develop the long term expected cost per unit time and theoretically present the corresponding optimum replacement schedule. Finally, we give a numerical example illustrating the models we proposed. The proposed models include more realistic factors and extend many existing models.
    Relation: APPLIED MATHEMATICAL MODELLING
    Appears in Collections:[經營管理學系 ] 期刊論文

    Files in This Item:

    File Description SizeFormat
    index.html0KbHTML212View/Open


    All items in ASIAIR are protected by copyright, with all rights reserved.


    DSpace Software Copyright © 2002-2004  MIT &  Hewlett-Packard  /   Enhanced by   NTU Library IR team Copyright ©   - Feedback